Ask Lemmy
A Fediverse community for open-ended, thought provoking questions
Rules: (interactive)
1) Be nice and; have fun
Doxxing, trolling, sealioning, racism, and toxicity are not welcomed in AskLemmy. Remember what your mother said: if you can't say something nice, don't say anything at all. In addition, the site-wide Lemmy.world terms of service also apply here. Please familiarize yourself with them
2) All posts must end with a '?'
This is sort of like Jeopardy. Please phrase all post titles in the form of a proper question ending with ?
3) No spam
Please do not flood the community with nonsense. Actual suspected spammers will be banned on site. No astroturfing.
4) NSFW is okay, within reason
Just remember to tag posts with either a content warning or a [NSFW] tag. Overtly sexual posts are not allowed, please direct them to either !asklemmyafterdark@lemmy.world or !asklemmynsfw@lemmynsfw.com.
NSFW comments should be restricted to posts tagged [NSFW].
5) This is not a support community.
It is not a place for 'how do I?', type questions.
If you have any questions regarding the site itself or would like to report a community, please direct them to Lemmy.world Support or email info@lemmy.world. For other questions check our partnered communities list, or use the search function.
6) No US Politics.
Please don't post about current US Politics. If you need to do this, try !politicaldiscussion@lemmy.world or !askusa@discuss.online
Reminder: The terms of service apply here too.
Partnered Communities:
Logo design credit goes to: tubbadu
view the rest of the comments
I was pretty active there, too! I had a long post about the differences between grounding and bonding that was stickied to the sidebar for a while. I think it's still there...
Oh man welcome to my daily hell about this topic haha. We build, install, repair systems for the largest steel mills in the country. Think 100 foot long lineups all bussed together, all 100% custom. Some of them easily 6k to 12k amps.
Painted surfaces can really sneak up on you, and we've changed how we bond panels like three times since I've been here for a couple years (worked on this type of equipment for about 10 tho). We used to not bond the sub to our common gnd bus on the floor, thinking the studs to the cabinet frame was enough. But with shielded cable, it needs a direct path to gnd on shield and gnd in one spot and for all shields to be tied together.
If you wanna get into a really heady topic, see what happens when you put a piece of strut or gnd wire or another power wire in between parallel runs of power wire per phase on a three-phase AC system
I did a tenant fit-out in a new building where the base-building was still under construction by a different electrical contractor when we started our buildout. The building had a penthouse switchboard that was fed with 5 parallel sets. Except the other EC pulled it as 1 phase per conduit. So they had 1 conduit with 5x a-phase conductors. Another with 5x b-phase, etc. Even 1 conduit with just 5x EGCs.
I noticed it because we had to pull a new feed into their switchboard right before permanent power got turned on to the building. This was literally the day before the utility was supposed to turn on power, They were this close to turning on a 2000A feeder with a single phase per conduit. And it was all metal conduit. They'd have burned that whole damn building down.
I told them they did it wrong and were going to start a fire. They didn't believe me at first, so I had to escalate it to my GC's safety coordinator, who had to bring it to their safety coordinator. They refused to call the utility to cancel turning on permanent power, so my safety guy and I had to intercept the utility guys when they showed up on site to tell them not to turn on power. Man was that other EC's foreman PISSED, but he eventually did have to pull it all out and repull it correctly.