this post was submitted on 30 Nov 2024
528 points (94.6% liked)
196
16730 readers
2570 users here now
Be sure to follow the rule before you head out.
Rule: You must post before you leave.
founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
The connection between 2 and 3 is blocked.
Damn, I didn't even notice that.
Even if you assume that it is not blocked, it is still 5. The pipe from 2 to 3 is never reached because 4 leaks out the hole in the bottom. Assume that the hole in the bottom is a flaw and 4 still leaks out the top before the pipe to 3 is reached.
Didn't notice that.