42
submitted 10 months ago by pingveno@kbin.social to c/world@lemmy.world

Roman Chervinsky, a colonel in Ukraine’s special operations forces, was integral to the brazen sabotage operation of the Russia-Germany pipeline, say people familiar with the planning.

you are viewing a single comment's thread
view the rest of the comments
[-] deleted@lemmy.world 11 points 10 months ago

Well, you might be right, unless you know.. umm if it’s replaced by coal.

Germany made a mistake by scrapping nuclear plants plan. Sure, green energy development has been in steady progress but it cannot be a primary source as of now.

[-] Draedron@lemmy.dbzer0.com -1 points 10 months ago

No. We didnt make a mistake by scrapping nuclear plants. They are uneconommical and we have no safe storage for the waste they produce. We made a mistake much earlier when we let china buy all our solar tech.

[-] deleted@lemmy.world 3 points 10 months ago

If you are not convinced yet, watch this video by Real Engineering.

https://youtu.be/UC_BCz0pzMw

[-] Sir_Osis_of_Liver@kbin.social 3 points 10 months ago* (last edited 10 months ago)

His figures are ridiculously optimistic for nuclear, $6000/kW and 6 year construction times.
Flamanville-3 and Olkiluoto-3 were both 12 years over their 5 year construction schedules. They were supposed to cost €3.3B and €3B respectively for 1650MW. Flamanville is expected to end up somewhere over €20B (€12000/kW), and Olkiluoto is somewhere around €11B, only due to 'not to exceed' limits in the supply contracts.

Hinkley Point C has gone from £16B to near enough £30B for 3200MW (£9400/kW)

It was the same with Vogtle 3 & 4. The preliminary budget of $12B, was changed initially to $14B at the start of construction. It's now somewhere around $30B and 7 years late. The two AP1000s have a combined output of 2200MW ($13000/kW).
V.C.Summer 2 & 3 was a similar pair of AP1000s. Costs went from $9B to $23B when the project was cancelled mid-construction.

Wind and solar are far faster to deploy, and typically on or near budget. The new, much cheaper redox flow batteries (100 MW/400 MWh for $266M Dalian, China) are capable of smoothing intermittency in areas without hydro, which can perform a similar function.

Edit. I should add that as of 2021, the global average for onshore wind is roughly $1300/kW. Prices continue to fall as new designs are introduced.

load more comments (1 replies)
load more comments (7 replies)
load more comments (8 replies)
this post was submitted on 13 Nov 2023
42 points (74.4% liked)

World News

38563 readers
2572 users here now

A community for discussing events around the World

Rules:

We ask that the users report any comment or post that violate the rules, to use critical thinking when reading, posting or commenting. Users that post off-topic spam, advocate violence, have multiple comments or posts removed, weaponize reports or violate the code of conduct will be banned.

All posts and comments will be reviewed on a case-by-case basis. This means that some content that violates the rules may be allowed, while other content that does not violate the rules may be removed. The moderators retain the right to remove any content and ban users.


Lemmy World Partners

News !news@lemmy.world

Politics !politics@lemmy.world

World Politics !globalpolitics@lemmy.world


Recommendations

For Firefox users, there is media bias / propaganda / fact check plugin.

https://addons.mozilla.org/en-US/firefox/addon/media-bias-fact-check/

founded 1 year ago
MODERATORS